Category: Renewable energy
Envidome SA was founded in August 2003 and is based in Thessaloniki, Greece. Since mid-2004, Envidome SA has been dynamically developing its activities in the field of renewable energies, in particular photovoltaic solar systems. The company´s activities range from planning, engineering, and the execution of electrical/mechanical/structural work to the connection of the FN system to the electricity grid. Envidome SA has very experienced and highly qualified engineers and technicians, i.e. installers of all necessary disciplines (electrical engineering, mechanical engineering) required for the implementation of projects and activities in the field of renewable energies.
The company is also certified according to ISO 9001 procedures. Between 2009 and 2011, Envidome SA realized FN projects with a capacity of over 12 MWp, and by the end of 2013, the company´s experts had completed and connected a further 13 MWp of FN power plants to the grid.In mid2013, Envidome d.o.o. Niš was founded with headquarters in Niš and offices in Niš and Belgrade and, until today, the company is exclusively engaged in the design and installation of solar power plants, and only now, due to the law, is the processing of waste in a free regime and biogas plants.
The completed orders are measured in dozens of MW and the plans in hundreds of MW. The successful work was also influenced by the cooperation with the IBRD Bank and the Development Agency of Serbia, which supported our projects with grants of up to 25% of the investment. A considerable number of solar power plants have been built with the help of IPARD funds, where the grants amount to 50% of the investment price. We commissioned several major power plants in 2022: MLADOST 1 LESKOVAC - 1,2MW, MLADOST 2 LESKOVAC - 1,2MW, MONICOM ALEKSINAC - 1,2MW, MLIN TIMOTIJEVIĆ BLACE - 850 KW, SPAJIĆ NEGOTIN - 1020 KW, STRELA LESKOVAC - 600 KW, FUNGO JUG LESKOVAC - 420KW, GOODWILL SUBOTICA - 220 KW. In 2023 we put into operation: Ivko solar Blace - 650 kW, Voćar Svilajnac – 469 kW, Fluidi Preševo – 700 kW, Rosso Leskovac – 225 kW, Jeligor – 410 kW and three land power plants with 1.2 MW each.
In addition, a large number of power plants with an output of 30 to 200 kW were built. And from May 2022, we will also be operating power plants for households. We also build power plants for households in cooperation with municipalities as part of energy renovation programs, where the power plants are subsidized with RSD 420,000.00.